Tuesday, November 11, 2025
22.1 C
Malaysia
the sun malaysia ipaper logo 150x150

Jalan Masjid India reopens after road subsidence repairs completed

Jalan Masjid India has reopened after DBKL completed repairs on road surface subsidence near Bombay Jewellery, with structural stability concerns addressed.

KUALA LUMPUR: Repair work on the road surface affected by subsidence near the Masjid India area has been completed.

Kuala Lumpur City Hall (DBKL) announced that Jalan Masjid India, closed this morning for safety reasons, reopened to the public at 6pm yesterday.

Investigations revealed the depression occurred locally, indicating a disturbance to the pavement structure’s stability.

“DBKL will continue close monitoring and conduct further inspections and scanning at the location and surrounding areas,” the authority stated.

DBKL emphasised that public safety remains its top priority.

The authority thanked all parties for their cooperation and compliance with safety instructions during restoration works.

Yesterday, road surface subsidence occurred at Jalan Bunus in front of Bombay Jewellery premises at 8.39am.

READ ALSO: Masjid India road collapse closes Jalan Bunus in KL

DBKL deployed teams alongside Air Selangor, Indah Water Konsortium (IWK) and Dang Wangi District Police Headquarters to conduct preliminary investigations and assess structural risks. – Bernama

Related

spot_img

Latest

Most Viewed

spot_img

Popular Categories