the sun malaysia ipaper logo 150x150
Friday, July 17, 2026
31.9 C
Kuala Lumpur
the sun malaysia ipaper logo 150x150

Melaka rolls out 10 short-term water measures

State Election

Johor State Election 2026

11 July 2026 Johor, Malaysia
Learn more

Melaka introduces 10 short-term measures to secure water supply amid hot weather, including cloud seeding and pumping from rivers and dams.

MELAKA: The Melaka state government has introduced 10 short-term measures to ensure sufficient water supply, particularly in response to the current hot and dry weather, the State Assembly was told today.

State executive councillor for Public Works, Infrastructure, Public Amenities and Transport Datuk Hameed Mytheen Kunju Basheer said the measures include cloud seeding operations using hygroscopic flare methods across the Melaka River basin, the Kesang River and catchment areas for the Durian Tunggal, Jus and Asahan dams.

“Also, pumping 220 million litres of water daily from the Grisek River in Muar to the Durian Tunggal Dam, and five million litres per day respectively from Ayer Keroh Lake to the Melaka River via Sungai Padang Keladi, as well as from Kesang 2 Pond to the Melaka River via Sungai Garing,” he said.

He added that water is being pumped from the Durian Tunggal and Krubong flood mitigation ponds into the Melaka River to raise its level, and from Bunded Storage II to Bunded Storage I using temporary pumps for use at the Bukit Sebukor Water Treatment Plant.

He said this in reply to Datuk Lim Ban Hong (BN-Kelebang) on the state government’s approach to ensuring adequate water supply in Melaka.

Hameed said other measures include releasing 220 million litres of water from the Jus Dam via the draw-off tower to increase the water level of the Batang Melaka River for supply to the Gadek Water Treatment Plant.

“Restrictions have also been imposed on water pumping for padi irrigation schemes at all individual and Department of Irrigation and Drainage (DID)-managed pump houses, with farmers urged to use only the minimum required for irrigation,” he said.

He said that another 54 million litres of water per day is being pumped from the Jus Dam to the Durian Tunggal Dam using temporary pontoon pumps to boost its capacity.

“We are also identifying disused ponds within forest reserves, government land and private land to be channelled into water bodies and subsequently to intake points at nearby treatment plants, including ponds at Taman Negeri and Bukit Sedanan Forest Reserve, Kesang Pond and the lake at Universiti Teknikal Malaysia Melaka (UTeM),” he said.

As of April 7, water levels stood at 20,078 million litres (64.1 per cent) at Durian Tunggal Dam, 25,900 million litres (57.3 per cent) at Jus Dam, and 612 million litres (87.9 per cent) at Asahan Dam.

Water levels at both Durian Tunggal and Jus dams remain at a precautionary level.

STAY AHEAD OF THE CURVE

Join our community for instant updates and exclusive content.

Join Telegram Channel

Related


spot_img

Latest News

Shaifubari clinches dramatic PGM Royal Pekan Closed Championship title

Veteran Shaifubari Muda capped his domestic season in style after defeating Marcus Lim in a playoff to win the PGM Royal Pekan Closed Championship at Royal Pekan Golf Club.Shaifubari carded a birdie on the 18th hole to finish at seven-under-par, taking the clubhouse lead after overnight leader Sukree bogeyed the closing hole to slip into second place.Marcus, playing alongside Sukree in the final group, birdied the last to force a playoff with Shaifubari.Returning to the 18th, both players found the fairway off the tee before Shaifubari fired his approach to within three yards of the pin. Marcus's second shot finished on the right side of the green, but his birdie putt stopped a yard short.Shaifubari calmly holed his birdie putt to seal the title and the RM31,500 winner's cheque.Ben Leong recorded the lowest round of the day with a six-under 66 to finish the tournament at five-under overall.

Most Viewed

spot_img
WC26

World Cup 2026

Updates, Fixtures, Results & Standings