the sun malaysia ipaper logo 150x150
Tuesday, October 13, 2026
31.1 C
Kuala Lumpur
the sun malaysia ipaper logo 150x150

MOT receives first set of ETS3 trains

Special coverage

Budget 2027

Aid, taxes and what it means for your wallet.

Read our coverage

KUALA LUMPUR: Malaysia has received the first set of electric trains (ETS3) for the Gemas-Johor Bahru Electric Double Track service yesterday.

The ETS3 train were handed over by the contractor China Railway Construction Corporation (CRCC) to the Ministry of Transport (MOT) at a presentation ceremony in Zhuzhou, Hunan Province, China.

At the event, Transport Minister Anthony Loke said he was happy that the ETS3 project was going well and hoped that the next set would be delivered and completed on time.

“When this rolling stock (is ready) by next year, we will start the ETS service from Kuala Lumpur Sentral to Johor Bahru when the Johor Bahru – Gemas track is ready later.

“Wait for this service to arrive and we will provide the latest service to Malaysians,“ he said through a video shared by MOT to the Malaysian media today.

Meanwhile, Loke in his speech at the ceremony said the new ETS3 train has a seating capacity of 312 seats, with 36 for business class and 276 standard seats.

“I have been informed that a total of eight trains will be assembled in Malaysia apart from the first two sets that will be shipped from Zhuzhou, China,“ he said.

Loke said the expected delivery date for all is set by Aug 12 next year, and ETS3 trains will be used for the Gemas-Johor Bahru newly electrified and double-tracked sections as well as the entire West Coast Rail Network from Padang Besar in the North to Johor Bahru in the South.

The new trains will enable transformations in travel behavior in Malaysia, he said.

He also described it as a game changer for millions of Malaysians, as journey time between Kuala Lumpur and Johor Bahru will be greatly reduced and transport reliability and safety will also improve significantly.

“It is also worth mentioning that significant efforts have been made to ensure Malaysian local manufacturers have meaningful participation and benefits from the positive spillover by working with CRRC in Malaysia,“ he said.

The Gemas-Johor Bahru electrified double-tracking rail project includes 192 kilometres of track and 11 stops. It will travel through four major districts in Johor, including Segamat, Kluang, Kulai, and Johor Bahru, before concluding at JB Sentral.

Upon completion, the journey from KL Sentral in Brickfields to JB Sentral will take three hours and 30 minutes at a speed of 140 km per hour.

STAY AHEAD OF THE CURVE

Join our community for instant updates and exclusive content.

Join Telegram Channel

Related


spot_img

Latest News

Retrenched workers may claim EIS benefits for six months amid minimum wage hike –...

Workers who lose their jobs as companies restructure to cope with Malaysia’s new RM2,000 minimum wage will be able to claim unemployment benefits for up to six months, provided they are covered under the Employment Insurance System (EIS).

Lelaki direman tujuh hari bantu siasatan kes bunuh 

Seorang lelaki pelarian Myanmar pemegang kad Suruhanjaya Tinggi Pertubuhan Bangsa-Bangsa Bersatu bagi Pelarian (UNHCR) direman tujuh hari bermula hari ini bagi membantu siasatan kes bunuh.

MACC, police to share information in MyEG, Zetrix AI investigation

The Malaysian Anti-Corruption Commission (MACC) will work closely with the police in investigating allegations involving MyEG Sdn Bhd (MyEG) and Zetrix AI Bhd, following a formal complaint lodged with the anti-graft agency last week.

India youth shift tactics as police clamp down on election protest

With tens of thousands of security personnel deployed in key parts of the capital to block the main protest site of Jantar Mantar, protesters turned to holding flash demonstrations elsewhere, taking authorities by surprise.

Most Viewed

spot_img