the sun malaysia ipaper logo 150x150
Friday, July 24, 2026
29.8 C
Kuala Lumpur
the sun malaysia ipaper logo 150x150

Putra Heights fire: Reconstruction of damaged homes expected to take two years – Nga

KUALA LUMPUR: The reconstruction and repair of homes damaged in the gas pipeline fire incident in Putra Heights, Subang Jaya, last month is expected to take two years to complete, said Housing and Local Government Minister Nga Kor Ming.

He said that so far, the reconstruction and repair work on 219 affected homes has been carried out according to plan and within the set timeframe.

“Contractors are actively working on the repair and reconstruction of the destroyed homes. I hope that, within less than two years, we can complete the construction of new houses for the affected victims…for homes that have been completely destroyed, we will build new ones, while those that can be repaired will be restored,” he said.

He said this to Bernama before appearing as a guest on Bernama TV’s Ruang Bicara programme, which discussed the topic “UN-HABITAT: Malaysia Ready to Lead Global Sustainable Development” at Wisma Bernama today.

Nga said the government, through the Ministry of Housing and Local Government (KPKT), had allocated RM46 million for the repair of homes and public infrastructure affected by the incident.

He said that, through the allocation from KPKT and the Subang Jaya City Council, RM6 million had been set aside to restore and rebuild public infrastructure and facilities, including roads, drainage systems, and public recreational parks that were damaged in the fire

The gas pipeline fire on April 1 caused flames to rise more than 30 metres high, with temperatures reaching over 1,000 degrees Celsius, and took almost eight hours to be completely extinguished.

The incident caused 81 homes to be completely destroyed, with structural damage exceeding 40 per cent, 81 homes partially damaged, 57 homes affected but not burned, and 218 homes left unaffected.

STAY AHEAD OF THE CURVE

Join our community for instant updates and exclusive content.

Join Telegram Channel

Related


spot_img

Latest News

KBS assessing possibility of Malaysia hosting F1 race

KBS is actively holding discussions and conducting assessments on the possibility of hosting a Formula 1 (F1) race at the Sepang International Circuit (SIC) to replace the Bahrain Grand Prix (GP) this October.

Novum Studio Secures New Funding to Launch Ahoy Project, an AI-Native Enterprise Transformation Platform,...

NEW YORK, USA - Media OutReach Newswire - 24 July 2026 - Novum Studio, the company behind Frog - a Gen Z social app often described as a "new-generation Snapchat" - said it has raised a new round of funding and will use the proceeds to launch Ahoy Project, an AI-native enterprise communication and collaboration platform, with internal testing scheduled for July 2026.

Shorter Trips, More Meaningful Experiences: OZO Taps into the Rise of Micro-trips Across Asia-Pacific

BANGKOK, THAILAND - Media OutReach Newswire - 24 July 2026 - As travellers across Asia-Pacific increasingly look for greater flexibility and balance in the way they travel, shorter and more frequent getaways are becoming a popular alternative to waiting for one long annual holiday.

Most Viewed

spot_img
WC26

World Cup 2026

Updates, Fixtures, Results & Standings