the sun malaysia ipaper logo 150x150
Friday, July 24, 2026
29.8 C
Kuala Lumpur
the sun malaysia ipaper logo 150x150

PM: There should be no more excuses for delays in projects for people in Sabah

TENOM: Prime Minister Datuk Seri Anwar Ibrahim today said that there should be no more excuses for delays in the development of projects for the people of Sabah, especially pertaining to water and electricity supplies, as well as the Pan Borneo Highway.

He said this needs to be emphasised as there are delayed development projects in the state, including the Ulu Padas Hydroelectric Dam here, which can provide a comfortable electricity and water supply for the people, if expedited.

“Delayed projects have two consequences – the cost will be increased and the hope of the people who longed for those facilities, especially electricity and water supply, will be crushed.

“For this dam project, for example, make sure the implementation and monitoring are being carried out. There should be no more excuses for delays.

“This (project) is urgent and critical, so let’s get it done faster and give comfort to the people,” he said when officiating the ground-breaking ceremony for the dam project today.

Present were Chief Minister Datuk Seri Hajiji Noor, Deputy Chief Minister I Datuk Seri Dr Jeffrey Kitingan, Minister in the Prime Minister’s Department (Sabah, Sarawak Affairs and Special Functions) Datuk Armizan Mohd Ali, and Sabah Energy Corporation Sdn Bhd (SEC) chairman Datuk Annuar Ayub.

The Ulu Padas Hydroelectric Dam, which is expected to be completed in 2029 with a cost of RM4 billion, has a power supply capacity of 187.5 megawatts. A study is underway for a water supply of 6,000 million litres per day.

The dam, with a reservoir area of 1,905 square kilometres, is being developed by UPP Holdings Sdn Bhd, established through a strategic collaboration between SEC, a government subsidiary, Gamuda Berhad, and Kerjaya Kagum Hitech JV Sdn Bhd.

Anwar said apart from the dam, the Sabah Pan Borneo Highway project is also facing delays due to contractor issues and political interference.

“These issues need to be swiftly resolved to provide the best transportation facilities for the people.

“Let’s be more transparent. The Pan Borneo Highway project has been ongoing for decades, it is nearly completed in Sarawak. RM15 billion for this project is not cheap. I want the Minister of Works, Datuk Seri Alexander Nanta Linggi, to monitor and delegate power to expedite (the project),” he said.

Besides benefiting the people, Anwar said these essential facilities are crucial in attracting investors.

Meanwhile, the Prime Minister hit out at claims by opposition leaders that the federal government is not giving due attention to Sabah by comparing what the federal government provides to the state with developments in Penang.

“They claim that Penang has a RM10 billion LRT project. That project is funded by the private sector, not the federal government…don’t play with such sentiments that divide our people,” he said.

Anwar said his Unity Government is working hard to bring development to the state for the benefit of the people.

In fact, he said in the 2024 Budget, RM6.8 billion in development expenditure is allocated for Sabah, while only RM1.4 billion for Penang. The allocation for Sabah is the highest in the country’s history, demonstrating the federal government’s concern for the Land Below the Wind.

“What’s the total allocation (including for operation expenditure) for Sabah? More than RM16 billion! The highest among the states, but the opposition is still criticising me; asking why we give more to Sabah and I have answered this in Parliament. I said it is because Sabah is seriously lagging in water and electricity supply,” he said.

As the Prime Minister, Anwar said it is his responsibility to ensure the development of all states, but the development of projects in Sabah needs to be given attention as the state is lagging behind other states in the peninsula. –Bernama

STAY AHEAD OF THE CURVE

Join our community for instant updates and exclusive content.

Join Telegram Channel

Related


spot_img

Latest News

KBS assessing possibility of Malaysia hosting F1 race

KBS is actively holding discussions and conducting assessments on the possibility of hosting a Formula 1 (F1) race at the Sepang International Circuit (SIC) to replace the Bahrain Grand Prix (GP) this October.

Novum Studio Secures New Funding to Launch Ahoy Project, an AI-Native Enterprise Transformation Platform,...

NEW YORK, USA - Media OutReach Newswire - 24 July 2026 - Novum Studio, the company behind Frog - a Gen Z social app often described as a "new-generation Snapchat" - said it has raised a new round of funding and will use the proceeds to launch Ahoy Project, an AI-native enterprise communication and collaboration platform, with internal testing scheduled for July 2026.

Shorter Trips, More Meaningful Experiences: OZO Taps into the Rise of Micro-trips Across Asia-Pacific

BANGKOK, THAILAND - Media OutReach Newswire - 24 July 2026 - As travellers across Asia-Pacific increasingly look for greater flexibility and balance in the way they travel, shorter and more frequent getaways are becoming a popular alternative to waiting for one long annual holiday.

Most Viewed

spot_img
WC26

World Cup 2026

Updates, Fixtures, Results & Standings