the sun malaysia ipaper logo 150x150
Friday, July 3, 2026
27.5 C
Kuala Lumpur
the sun malaysia ipaper logo 150x150

Water demand in Sarawak expected to increase to 2,400 million litre per day by 2030

KUCHING: The projected water demand in Sarawak in 2030 will increase by 2,400 Million Litres Per Day (MLD) compared to the current demand of 2,060 JLH, said State Utilities and Telecommunications Minister Datuk Seri Julaihi Narawai.

He said this was based on the Sarawak Water Supply and Water Grid Master Plan.

Thus, to ensure adequate water margin reserves, he said, Sarawak needs at least 20 per cent of the capacity of existing water treatment plants.

“Currently, several major water treatment plants are operating at a low margin reserve rate such as the Batu Kitang Water Treatment Plant in Kuching which is at a rate of 12 per cent and the Salim Water Treatment Plant in Sibu which is only at a rate of one per cent.

“Therefore, several critical main projects are being and need to be implemented immediately to meet the expected increase in water demand,“ he said when winding up the debate for his ministry at the State Assembly sitting here today.

ALSO READ: Teo: Water tariff adjustment can help consolidate water supply system

Julaihi said for the upgrading project of the Batu Kitang Water Treatment Plant (Plant Two) here, which is scheduled to be completed in the third quarter of this year, the plant’s production capacity can increase to 868 MLD compared to the current 764 MLD capacity.

“As for the capacity upgrading project of the Batu Kitang Water Treatment Plant (Plant Four), it will help increase the plant’s production capacity to 968 MLD by 2026.

“The construction of the Phase One new water treatment plant in Landeh, Kuching, which is currently in the planning stage, is estimated to have a capacity of 200 MLD, while the upgrading project of the Salim Water Treatment Plant, Sibu, which is scheduled to be completed by the fourth quarter of 2026, will increase the capacity from 150 MLD to 300 MLD,“ he said.

ALSO READ: RM7.5m allocated for water supply to affected residents in 12 Sabah districts

In addition, Julaihi said the ministry is also implementing upgrading project to replace old and dilapidated pipes in the state, involving an allocation of RM1.085 billion, of which RM247 million has been allocated for this this year.

“A stretch of 2,742 kilometres (km) of old and dilapidated pipelines are still used in the water supply distribution system in Sarawak. This is the main cause of the high rate of non-revenue water, which is an average of 43 per cent,“ he said.

STAY AHEAD OF THE CURVE

Join our community for instant updates and exclusive content.

Join Telegram Channel

Related


spot_img

Latest News

Bora Pharmaceuticals Completes Acquisition of MacroGenics’ Rockville Manufacturing Operations

TAIPEI, TAIWAN - Media OutReach Newswire - 2 July 2026 - Bora Pharmaceuticals Co., Ltd. ("Bora" or "Bora Group"; TWSE: 6472; OTCQX: BORAY) today announced the completion of its acquisition of the GMP manufacturing operations of MacroGenics, Inc. (NASDAQ: MGNX) including its biologics drug substance facility in Rockville, Maryland and an associated warehousing center in Frederick, Maryland, for total consideration of US $122.5 million through its wholly owned subsidiary Bora Biologics USA, LLC.. Upon closing, Bora signed a long-term CDMO Service Agreement with MacroGenics.

Most Viewed

spot_img
WC26

World Cup 2026

Updates, Fixtures, Results & Standings